Want to post an ad on exploreClarion?

Contact us today at 814-918-2003 or email info@exploreClarion.com.

Community Partner

Clarion Area Jobs

Featured Local Business: Clarion Federal Credit Union

  • Clarion Federal Credit Union
    144 Holiday Inn Road
    Clarion, PA 16214
    814-226-5032
    View Website

 Powered by Max Banner Ads 

 Powered by Max Banner Ads 

Free Classifieds


 Powered by Max Banner Ads 

 Powered by Max Banner Ads 

Fryburg Mayfest


 Powered by Max Banner Ads 

exploreClarion.com Contest Winners

Explore New Sponsor Spotlight


 Powered by Max Banner Ads 

Featured Local Event


 Powered by Max Banner Ads 

Featured Local Jobs


 Powered by Max Banner Ads 

Featured Local Sponsor


 Powered by Max Banner Ads 

 Powered by Max Banner Ads 

WRC Senior Services Caregiver Connections


 Powered by Max Banner Ads 

 Powered by Max Banner Ads 

Featured Local Property


 Powered by Max Banner Ads 

 Powered by Max Banner Ads 

Construction to Begin on Route 666 Bridge in Hickory Township

Wednesday, May 16, 2018 @ 12:05 AM

Posted by Joanne Bauer

bridge-666HICKORY TWP., Pa. – Construction for the Route 666 (David Zeisberger Highway) bridge, spanning Beaver Run in Hickory Township, Forest County, is scheduled to begin as part of the Pennsylvania Department of Transportation’s (PennDOT) Rapid Bridge Replacement Project.

Replacement of this bridge will allow PennDOT to remove it from Forest County’s structurally deficient bridge list.

Construction is expected to begin during the week of May 28 and be complete in late July. During construction, drivers will be directed to follow a detour along German Hill Road (Route 4004), Grange Hall Road (Route 4008), Little Hickory Road (Route 3004) and Route 62.

In the event of unfavorable weather or unforeseen activities, this schedule may change.

This bridge is referred to as JV-12 and is one out of the 558 bridges being replaced under the Rapid Bridge Replacement Project. JV references the joint-venture partnership between Walsh/Granite, which is leading construction for the entire project.

The Rapid Bridge Replacement Project is a public-private partnership (P3) between PennDOT and Plenary Walsh Keystone Partners (PWKP), under which PWKP will finance, design, replace, and maintain the bridges for 25 years. The P3 approach will allow PennDOT to replace the bridges more quickly while achieving significant savings and minimizing impacts on motorists.

To see the bridges included in the statewide initiative and to learn more about the Rapid Bridge Replacement Project and P3 in Pennsylvania, visit www.p3forpa.pa.gov.

Additional information on the project, the team, and how to bid on the project can be found atwww.parapidbridges.com or by calling the project hotline at 877-444-9990 or email info@parapidbridges.com.


Copyright © 2018 EYT Media Group, Inc. All rights reserved. Any copying, redistribution or retransmission of the contents of this service without the express written consent of EYT Media Group, Inc. is expressly prohibited.

Comments are temporarily closed. A new and improved comments system will be introduced shortly.


 Powered by Max Banner Ads 

Sports

Local and National Sports News
Sports

Recipes

Recipes submitted by our Readers

cinema

local movie listings

Feedback

Have a suggestion?